End User: NYCT
Contractor: TC Electric
Description: The Culver Line viaduct, located between the portal of Carroll Street Station and the portal south of the Fourth Avenue Station, was built in 1930. The goal of this project was to rehabilitate the concrete viaduct deck including by removing existing track, performing DC and signal work and installing cables within the viaduct limit to permit repair and rehabilitation of the existing concrete deck.
Twinco Scope of Work: