South Ferry Terminal Complex Rehabilitation Contract

Category
2016
About This Project

End User: NYCT

Contractor: Five Star Electric

Description: The work includes removal and installation of new electrical equipment, communication, fiber optic equipment, HVAC system, ventilation system, pumping equipment, traction power system, signal work, track work, installation of seven elevators, and two escalators, cleaning/replacement of architectural finished of the station, chemical grouting, and painting.

Twinco Scope of Work:

  • Train Stops and Layouts
  • Stainless Steel and Aluminum Cable Tray
  • LED Holding/Starting Lights
  • BH110 Rectifiers
  • Various Wayside Equipment (Column Clamps, Riser Boxes, Fuse Boxes, etc)