MNR Power C&S Improvement Project

Category
2016
About This Project

End User: Metro North

Contractor: Judlau Contracting

Description: The project involves the complete design, construction and testing of replacement infrastructure for various MNR Power, Communications and Signaling equipment and cabling that was damaged as a result of Hurricane Sandy.

Twinco Scope of Work:

  • Over 5500’ of Stainless Steel Cable Tray
  • 17 – 48” x 96” x 18” SS NEMA 4x Pull Boxes
  • 17 – 48” x 96” x 18” SS NEMA 4x Pull Boxes